0
RESEARCH PAPERS

Field Testing and Adjusting of Hydraulic Turbine-Generator to Improve System Regulation

[+] Author and Article Information
H. M. Stone

Southern California Edison Company, Los Angeles, Calif.

J. Eng. Power 83(1), 53-59 (Jan 01, 1961) (7 pages) doi:10.1115/1.3673130 History: Received August 26, 1959; Online January 10, 2012

Abstract

This paper presents some of the results and methods of extensive hydro prime-mover governor tests conducted at the Big Creek Hydro System of the author’s company. Each governor response was improved by making co-ordinated governor adjustments. Frequency-response curves and dead band X-Y charts are included to show the improvement obtained. Frequency dead band and the governor transient response time were improved as much as 50 per cent. A good share of the credit for the results and improvements obtained is due to the use of adequate test equipment. As described elsewhere, the Mobile Dynamics Laboratory for Studying Generating Plant Controls and Governors was designed and used for extensive preliminary tests. Later, a small compact test rig, described in this paper, was assembled and used for the routine testing and adjusting of governors.

Copyright © 1961 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In