0
RESEARCH PAPERS

Transient Loading Improvements for Large Steam-Electric Generating Units

[+] Author and Article Information
Charles Strohmeyer

Gilbert Associates, Inc., Reading, Pa.

J. Eng. Power 84(1), 9-20 (Jan 01, 1962) (12 pages) doi:10.1115/1.3673389 History: Received July 08, 1960; Online January 10, 2012

Abstract

The intent of this paper is to discuss the ultimate in operating flexibility during transient conditions that can be built into new designs having steam conditions of 2400 psig, 1050/1000 F reheat or above. The following discussion proposes an over-all operating philosophy in the hope of developing better understanding among the engineers, operators, and equipment manufacturers. Emphasis is placed upon steam temperature control to suit various turbine operating conditions. New methods proposed include a means of raising throttle steam enthalpy during hot turbine starts, a control and/or supervisory system for regulating unit start-ups and shutdowns, and a new means of cooling the low pressure turbine exhaust during start-up. As a result, for short duration turbine generator shutdowns as 8 hours, units may be unloaded rapidly at full pressure and in some cases may be restarted from turning gear to one third load restoring design primary steam temperature and pressure in as little as 35 minutes without sacrifice of safety.

Copyright © 1962 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In