0
RESEARCH PAPERS

Off-Design Exergy Audit of a Thermal Power Station

[+] Author and Article Information
E. Yasni

Electricity Corporation, Wellington, New Zealand

C. G. Carrington

Department of Physics, University of Otago, Dunedin, New Zealand

J. Eng. Gas Turbines Power 110(2), 166-172 (Apr 01, 1988) (7 pages) doi:10.1115/1.3240096 History: Received January 08, 1987; Online October 15, 2009

Abstract

A second-law state analysis procedure, having on-line capability, has been implemented at a fossil-fueled power station at Huntly, N.Z. The analysis fully integrates the combustion and steam processes in order to provide a viable understanding of the influence of operating parameters on the distribution of losses within the plant. The procedures do not rely significantly on manufacturer’s performance data and the validity of the audit is substantially verifiable. Examples of audit data are presented, including operation with and without the top heater and a comparison of throttle and sliding pressure control.

Copyright © 1988 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In