0
RESEARCH PAPERS

Low Cost Capacity For Peaking Generation

[+] Author and Article Information
E. S. Miliaras

Boston Edison Company, Boston, Mass.

J. Eng. Power 90(1), 11-14 (Jan 01, 1968) (4 pages) doi:10.1115/1.3609126 History: Received September 15, 1967; Online August 25, 2011

Abstract

A means of obtaining peaking generation from existing generating units is proposed, by installing lower steam temperature boiler capacity in parallel with the existing boiler; the additional steam bypassing the high pressure turbine and the reheater into the intermediate pressure turbine. The economics compare very favorably to the available methods of obtaining peaking generation. Future peaking capability built into baseload units is also considered.

Copyright © 1968 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In