0
RESEARCH PAPERS

Performance Testing of 580-MW Joliet Units No. 7 and No. 8

[+] Author and Article Information
L. R. Basinski

Commonwealth Edison Co., Chicago, Ill.

D. E. McKinley

Westinghouse Electric Corp., Philadelphia, Pa.

J. Eng. Power 90(1), 65-72 (Jan 01, 1968) (8 pages) doi:10.1115/1.3609136 History: Received August 07, 1967; Online August 25, 2011

Abstract

This paper emphasizes the point that performance testing of large steam turbines in accordance with the provisions of ASME Power Test Code No. 6–1964 requires extensive coordination between turbine manufacturer and the operating utility. This paper outlines the procedures followed in preparing for, conducting, and analyzing the results of performance tests conducted on two, duplicate, 580-MW cross-compound steam turbines installed in the Joliet Station of the Commonwealth Edison Company. Selection of test instrumentation and methods of calculating the test performance are discussed. Application of on-line and off-line digital computers for calculation of test results is reviewed. Problems encountered during the tests which affected accuracy of calculated results are outlined.

Copyright © 1968 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In