Gas Turbine Commissioning Procedure

[+] Author and Article Information
R. Oegerli

Department of Commissioning Gas Turbines, Brown, Boveri & Co., Baden, Switzerland

J. Eng. Power 101(1), 125-129 (Jan 01, 1979) (5 pages) doi:10.1115/1.3446433 History: Received December 14, 1978; Online July 14, 2010

Abstract

Although new, modern gas turbine power station with its control and supervisory systems are more complex than ten years ago, Brown Boveri still uses the same commissioning procedure, because of the good experience gained throughout the years. The main features are that: One commissioning engineer is responsible for the whole plant and is trained to commission all systems by himself. Specific records are provided for every unit with all settings, characteristics and special instructions in addition to general instructions, settings and characteristics. The paper explains the sequence of the works and gives an insight into: (1) Checks, tests and adjustments before shipping, (2) Commissioning work on site, (3) Commissioning schedule, (4) Commissioning personnel schedule; (5) Instrumentation and measuring equipment on site, (6) Paper work on site, reporting, (7) Acceptance tests/provisional acceptance, (8) Instruction of customer’s personnel, (9) Supervision during initial period of operation, service engineer.

Copyright © 1979 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In