0
RESEARCH PAPERS

An Assessment of Deposition in PFBC Power Plant Turbines

[+] Author and Article Information
R. A. Wenglarz

Westinghouse R&D Center, Pittsburgh, Pa. 15235

J. Eng. Power 103(3), 552-557 (Jul 01, 1981) (6 pages) doi:10.1115/1.3230764 History: Received July 23, 1980; Online September 28, 2009

Abstract

Using turbine deposition models and data from PFBC (pressurized fluidized bed combustion) pilot plant/cascade experiments, deposit buildup rates and turbine maintenance intervals to remove deposits are projected for a PFBC power plant system. The power plant consists of a 10 atmosphere PFB boiler with a matching 10:1 pressure ratio turbine and a gas cleanup system to remove particulates from combustor product gases before entering the turbine. The effects on turbine deposition of three alternative particle cleanup systems are evaluated. Turbine deposit removal intervals to prevent excessive power drops due to deposition are found for the alternative gas cleanup systems.

Copyright © 1981 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In