0
RESEARCH PAPERS

Use of Cascade and Small Turbine Tests to Determine Erosion of Utility Turbines

[+] Author and Article Information
R. A. Wenglarz

Westinghouse Research and Development Center, Pittsburgh, Pa.

M. Menguturk

Department of Mechanical Engineering, Bogazici University, Istanbul, Turkey

J. Eng. Power 104(1), 58-63 (Jan 01, 1982) (6 pages) doi:10.1115/1.3227266 History: Received December 09, 1980; Online September 28, 2009

Abstract

Experiments using cascades and small turbines have been conducted or are being considered to simulate large utility turbine operation with future coal-fired power plants. The purpose of these experiments is to evaluate utility turbine tolerances to particulates and to determine gas cleanup requirements for successful turbine performance. Since these tests do not fully reproduce the flow and erosion conditions in large utility turbines, this paper explores the interpretation of data from simulation experiments to assess erosion in large utility turbines. Effects of physical scale, rotation speed, and pressure differences between test cascades and small test turbines and large utility turbines are considered.

Copyright © 1982 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In