0
Research Papers: Gas Turbines: Controls, Diagnostics, and Instrumentation

Gas Turbine Combined Cycle Dynamic Simulation: A Physics Based Simple Approach

[+] Author and Article Information
S. Can Gülen

e-mail: scgulen@bechtel.com

Kihyung Kim

e-mail: kihyung.kim@ge.com

GE Power & Water,
1 River Road,
Schenectady, NY 12345

1Corresponding author.

2Currently at Bechtel Power, 5275 Westview Dr., Frederick, MD 21703.

Contributed by the Controls, Diagnostics and Instrumentation Committee of ASME for publication in the JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER. Manuscript received August 20, 2013; final manuscript received August 28, 2013; published online October 25, 2013. Editor: David Wisler.

J. Eng. Gas Turbines Power 136(1), 011601 (Oct 25, 2013) (15 pages) Paper No: GTP-13-1317; doi: 10.1115/1.4025318 History: Received August 20, 2013; Revised August 28, 2013

This paper describes a simplified physics-based method derived from fundamental relationships to accurately predict the dynamic response of the steam bottoming cycle of a combined cycle power plant to the changes in gas turbine exhaust temperature and flow rate. The method offers two advantages: (1) rapid calculation of various modes of combined cycle transient performance such as startup, shutdown, and load ramps for conceptual design and optimization studies, and (2) transparency of governing principles and solution methods for ease of use by a wider range of practitioners. Thus, the method facilitates better understanding and dissemination of said studies. All requisite formulas and methods described in the paper are readily amenable to implementation on a computational platform of the reader's choice.

FIGURES IN THIS ARTICLE
<>
Copyright © 2014 by ASME
Your Session has timed out. Please sign back in to continue.

References

Husak, M., Jones, C., and Tegel, D., 2006, “Combined Cycle Plant Operational Flexibility,” POWER-GEN International2006, Orlando, FL, November 28–30.
Gülen, S. C., and Jones, C. M., 2011, “GE's Next Generation CCGT Plants: Operational Flexibility is the Key,” Mod. Power Syst., 31(6), pp. 16–18.
Bauver, W., 2011, “Alstom's HRSG—Optimized for Today's Flexibility Requirements,” POWER-GEN International, Las Vegas, NV, December 13–15.
BallingL., 2011, “Fast Cycling and Rapid Start-Up: New Generation of Plants Achieves Impressive Results,” Mod. Power Syst., 31, pp. 35–41.
Cox, J., 2010, “Implications of intermittency,” Mod. Power Syst., 30, pp. 22–23.
Peltier, R., 2010, “Flexible Turbine Operation is Vital for a Robust Grid,” Power, 154, pp. 50–54.
ProTRAX®, Trax LLC, Energy Solutions, Lynchburg, VA.
Easy5, MSC Software Corporation, Santa Ana, CA.
Aspen HYSYSVersion 7.3, Aspen Technology, Inc., Burlington, MA.
Apros, Process Simulation Software, Fortum Power Solutions, Fortum, Finland.
MatlabSimulink, MathWorks, Natick, MA.
Modelica Association, www.modelica.org
Hack, H., Fan, Z., Seltzer, A., and Alvarez, J., 2012, “Advanced Methods of HRSG Design for Life Cycle Optimization Under Fast Startups,” POWER-GEN International 2012, Orlando, FL, December 11–13.
Briggs, R. J., 1999, “Repowering a 2,400 psig Steam Cycle With Natural Circulation HRSGs,” POWER-GEN International 1999, New Orleans, LA, November 30-December 2.
Cha, H.Song, Y. S., Kim, K. J., Kim, J. R., and Kim, S. M., 2011, “Dynamic Simulation of a HRSG System for a Given Startup/Shutdown Curve,” ASME 2011 International Mechanical Engineering Congress and Exposition, Denver, CO, November 11-17, ASME Paper No. IMECE2011-62468. [CrossRef]
Flynn, M. E., and O'Malley, M. J., 1999, “A Drum Boiler Model for Long Term Power System Dynamic Simulation,” IEEE Trans. Power Syst., 14(1), pp. 209–217. [CrossRef]
Casella, F., and Pretolani, F., 2006, “Fast Start-Up of a Combined Cycle Power Plant: A Simulation Study With Modelica,” 5th International Modelica Conference, Vienna, Austria, September 4-6.
Dechamps, P. J., 1994, “Modelling the Transient Behavior of Combined Cycle Plants,” International GT and Aeroengine Congress and Exposition, The Hague, Netherlands, June 13-16, ASME Paper No. 94-GT-238.
Dechamps, P. J., 1995, “Modelling the Transient Behaviour of Heat Recovery Steam Generators,” Proc. Inst. Mech. Eng., 209(4), pp. 265–273. [CrossRef]
Jolly, S., Gurevich, A., and Pasha, A., 1994, “Modeling of Start-Up Behavior of Combined Cycle HRSGs,” International GT and Aeroengine Congress and Exposition, The Hague, Netherlands, June 13-16, ASME Paper No. 94-GT-370.
De Mello, F. P., and Ahner, D. J., 1994, “Dynamic Models for Combined Cycle Plants in Power System Studies,” IEEE Trans. Power Syst., 9(3), pp. 1698–1708. [CrossRef]
Kim, T. S., Lee, D. K., and Ro, S. T., 2000, “Analysis of Thermal Stress Evolution in the Steam Drum During Start-Up of a Heat Recovery Steam Generator,” Appl. Therm. Eng., 20, pp. 977–992. [CrossRef]
Bausa, J., and Tsatsaronis, G., 2001, “Dynamic Optimization of Startup and Load-Increasing Processes in Power Plants—Part I: Method,” ASME J. Eng. Gas Turbines Power, 123, pp. 246–250. [CrossRef]
Bausa, J., and Tsatsaronis, G., 2001, “Dynamic Optimization of Startup and Load-Increasing Processes in Power Plants—Part II: Application,” ASME J. Eng. Gas Turbines Power, 123, pp. 251–257. [CrossRef]
Shin, J. Y., Jeon, Y. J., Maeng, D. J., Kim, J. S., and Ro, S. T., 2002, “Analysis of the Dynamic Characteristics of a Combined-Cycle Power Plant,” Energy, 27, pp. 1085–1098. [CrossRef]
Sanaye, S., Moradi, A., Bashiri, F., Dashti, A. S., Mehranian, D., and Mehrara, M., 2003, “Performance Assessment of a Transient Model for HRSGs in Combined Cycle Power Plants,” ASME Turbo Expo 2003, Atlanta, GA, June 16–19, ASME Paper No. GT2003-38810. [CrossRef]
Sanaye, S., and Rezazadeh, M., 2007, “Transient Thermal Modeling of Heat Recovery Steam Generators in Combined Cycle Power Plants,” Int. J. Energy Res., 31, pp. 1047–1063. [CrossRef]
Mansour, F. M., Abdul Aziz, A. M., Abdel-Ghany, S. M., and El-Shaer, H. M., 2003, “Combined Cycle Dynamics,” Proc. Inst. Mech. Eng., Part A, 217, pp. 247–258. [CrossRef]
Shirakawa, M., Nakamoto, M., and Hosaka, S., 2005, “Dynamic Simulation and Optimization of Start-Up Processes in Combined Cycle Power Plants,” JSME Int. J., Ser. B, 48(1), pp. 122–128. [CrossRef]
Alobaid, F., Postler, R., Ströhle, J., Epple, B., and Kim, H.-G., 2008, “Modeling and Investigation of Start-Up Procedures of a Combined Cycle Power Plant,” Appl. Energy85, pp. 1173–1189. [CrossRef]
Rowen, W. I., 1983, “Simplified Mathematical Representations of Heavy-Duty Gas Turbines,” ASME J. Eng. Power, 105, pp. 865–869. [CrossRef]
Incropera, F. P., and Dewitt, D. W., 2002, Introduction to Heat Transfer, 4th ed., John Wiley and Sons, Inc., New York.
Marthinuss, J. E., Jr. and Hall, G., “Thermal System Transient Response,” Heat Transfer Handbook, McGraw-Hill, New York, Chap. 15.
Kehlhofer, R.Rukes, B., Hannemann, F., and Stirnimann, F., 2009, Combined Cycle Gas and Steam Turbine Power Plants, 3rd ed., PennWell Corp., Tulsa, OK.
GT PRO Version 20.0, Thermoflow, Inc., Sudbury, MA, www.thermoflow.com
Ray, A., 1980, “Dynamic Modeling of Power Plant Turbines for Controller Design,” Appl. Math. Model., 4, pp. 109–112. [CrossRef]
Akhtar, S. Z., 2003, “Proper Steam Bypass System Design Avoids Steam Turbine Overheating,” Power Eng. J., 107(6), pp. 44–52.
Anderson, R. W., and van Ballegooyen, H., 2003, “Steam Turbine Bypass Systems,” Comb. Cycle J., 4Q/2003, pp. 3–8.
Brandon, G., Schnaitmann, K., and Klatt, S., 2002, “Steam System Design Considerations for Three-Pressure Reheat Cycles With Cascade Bypass System,” International Joint Power Generation Conference, Phoenix, AZ, June 24-26, ASME Paper No. IJPGC2002-26116. [CrossRef]
VGB PowerTech Guideline, 1990, Thermal Behaviour of Steam Turbines, 2nd ed. (revised), VGB PowerTech Service GmbH, Essen, Germany.
Viswanathan, R., 1989, Damage Mechanisms and Life Assessment of High-Temperature Components, ASM International, Metals Park, OH.
Schilke, P. W., 2004, “Advanced Gas Turbine Materials and Coatings,” GE Energy Library, GE Energy, Schenectady, NY, Paper No. GER-3569G.
Taylor, D., and Pasha, A., 2012, “Economic Operation of Fast-Starting HRSGs,” Power, 154(6), pp. 30–37.
Gülen, S. C., and Smith, R. W., 2010, “Second Law Efficiency of the Rankine Bottoming Cycle of A Combined Cycle Power Plant,” ASME J. Eng. Gas Turbines Power, 132(1), p. 011801. [CrossRef]
Fontaine, P., and Galopin, J.-F., 2007, “HRSG Optimization for Cycling Duty,” Power Eng. J., 111(11), pp. 170–184.
Hampson, S., Robertson, D. G., and Simandjuntak, S., 2011, “Comparing ASME, European Boiler Codes and Their Impacts on Design, Operation,” Comb. Cycle J., 1Q/2011, pp. 118–121.
Özışık, M. N., 1988, Conduction Heat Transfer, John Wiley and Sons, Inc., New York.
Mitrovic, D., and Zivkovic, D., 2010, “Computation of Working Life Consumption of a Steam Turbine Rotor,” ASME J. Pressure Vessel Technol., 132, p. 021202. [CrossRef]
Breitkopf, G. E., 1980, “Determination of Heat Transfer Coefficients in Steam Turbines,” Waerme- Stoffübertrag., 13, pp. 195–204. [CrossRef]
Kohan, A. L., and Spring, H. M., 1991, Boiler Operator's Guide, 3rd ed.,” McGraw-Hill, New York.
Greis, J., Gobrecht, E., and Wendt, S., 2012, “Flexible and Economic Operation of Power Plants—25 Years of Expertise,” ASME Turbo Expo 2012, Copenhagen, Denmark, June 11–15, ASME Paper No. GT2012-68716.

Figures

Grahic Jump Location
Fig. 1

Typical gas turbine start characteristics for CC startup after an overnight shutdown [34]

Grahic Jump Location
Fig. 2

Approximate solution setup for an arbitrary gas temperature T (t) (see Eqs. (3) and (4))

Grahic Jump Location
Fig. 3

Dynamic response of selected HRSG heat exchanger sections during a cold start [14]. The orange dashed arrow-line indicates the increasing time constant of the respective sections with increasing distance from the HRSG gas inlet.

Grahic Jump Location
Fig. 4

Thermal stress as a function of the temperature gradient in the solid body. The shaded area represents the yield strength of typical alloy steels.

Grahic Jump Location
Fig. 5

Maximum allowable admission steam ramp rates

Grahic Jump Location
Fig. 6

HP section temperature and rotor stress profiles for a GTCC ST during prewarming and rolling [17]

Grahic Jump Location
Fig. 7

“Cold” startup for a 400 MW GTCC (3PRH, single-shaft). Thick dotted lines are from Ref. [34]. Rated performance data are assumptions.

Grahic Jump Location
Fig. 8

Predicted steam flows for the GTCC startup in Fig. 7

Grahic Jump Location
Fig. 9

Predicted steam temperatures for the GTCC startup in Fig. 7 (566 °C (1050 °F) rated HP and HRH)

Grahic Jump Location
Fig. 10

Predicted steam pressures for the GTCC startup in Fig. 7 (125/2025/4 bar rated HP/IP/LP, respectively)

Grahic Jump Location
Fig. 11

Predicted IP rotor stress for the GTCC startup in Fig. 7

Grahic Jump Location
Fig. 12

Predicted HP drum stress for the GTCC startup in Fig. 7

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In