A multistage expansion planning problem is discussed concerning a gas turbine cogeneration plant for district heating and cooling using an optimization approach. An optimal sizing method for single-stage planning proposed by the authors is extended to this case. Equipment capacities and utility maximum demands at each expansion stage are determined so as to minimize the levelized annual total cost subject to increasing energy demands. A numerical study on a simple-cycle gas turbine cogeneration plant to be installed in a district development project clarifies the relationship between optimal expansion planning and energy demand trend, and shows the effectiveness of the proposed method.
Issue Section:
Gas Turbines: Industrial and Cogeneration
1.
Cheney
E. W.
Goldstein
A. A.
1959
, “Newton’s Method for Convex Programming on Tchebycheff Approximation
,” Numerical Mathematics
, Vol. 1
, pp. 253
–268
.2.
Garfinkel, R. S., and Nemhauser, G. L., 1972, Integer Programming, Wiley, New York, pp. 5–7.
3.
Ito, K., Yokoyama, R., Horii, S., Matsumoto, Y., and Akagi, S., 1987, “An optimal Operational Planning Model for Gas Turbine Cogeneration Plants,” Proc. 1987 Tokyo International Gas Turbine Congress, Vol. I, pp. 97–104.
4.
Ito, K., Yokoyama, R., Yamaguchi, T., Matsumoto, Y., and Akagi, S., 1988, “Optimal Operational Planning of a Gas Turbine Combined Heat and Power Plant Based on the Mixed-Integer Programming,” Proc. IFAC International Symposium on Power Systems Modelling and Control Applications, pp. 13.4.1–13.4.7.
5.
Ito
K.
Yokoyama
R.
Akagi
S.
Matsumoto
Y.
1990
, “Influence of Fuel Cost on the Operation of a Gas Turbine-Waste Heat Boiler Cogeneration Plant
,” ASME JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER
, Vol. 112
, pp. 122
–128
.6.
Ito
K.
Yokoyama
R.
Matsumoto
Y.
1995
, “Optimal Operation of Cogeneration Plants With Steam-Injected Gas Turbines
,” ASME JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER
, Vol. 117
, pp. 60
–66
.7.
Land
A. H.
Doig
A. G.
1960
, “An Automatic Method of Solving Discrete Programming Problems
,” Econometrica
, Vol. 28
, pp. 497
–520
.8.
Writte, L. C., Schmidt, P. S., and Brown, D. R., 1988, Industrial Energy Management and Utilization, Hemisphere Publishing, Washington, pp. 68–69.
9.
Yokoyama, R., and Ito, K., 1991, “An Evaluation of Gas Turbine Cogeneration Plants for a District Energy Supply Center,” Proc. 1991 Yokohama International Gas Turbine Congress, Vol. I, pp. 121–128.
10.
Yokoyama
R.
Ito
K.
Matsumoto
Y.
1994
, “Optimal Sizing of a Gas Turbine Cogeneration Plant in Consideration of Its Operational Strategy
,” ASME JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER
, Vol. 116
, pp. 32
–38
.
This content is only available via PDF.
Copyright © 1996
by The American Society of Mechanical Engineers
You do not currently have access to this content.