Honeywell Engines, Systems & Services has successfully addressed critical concerns that are slowing commercialization of structural ceramics in gas turbines. The U.S. Department of Energy (DoE) sponsored Ceramic Turbine Engine Demonstration Project (CTEDP) had the mission of advancing ceramic gas turbine component technology toward commercialization. The thrust of the program was to “bridge the gap” between ceramics in the laboratory and near-term commercial heat engine applications. Most of this mission has been achieved. The 331-200[CT] auxiliary power unit (APU) test bed featured ceramic first-stage nozzles and blades. Fabrication of ceramic components provided manufacturing process demonstration scale-up to the minimum levels needed for commercial viability. Through this program, design methods refinement and the development of new design methods unique to ceramic turbine components have been supported and validated in rig and development engine testing. Over 6800 hours of on-site endurance tests demonstrated component reliability. Additional field testing in APUs onboard commercial aircraft and stationary industrial engines has been initiated and will continue beyond completion of this program.
Skip Nav Destination
Article navigation
July 2002
Technical Papers
Ceramic Turbine Engine Demonstration Project: A Summary Report
B. Schenk
B. Schenk
Honeywell Engines, Systems & Services,(1) APU Technology Development, 111 S. 34th Street, M/S 503-319, Phoenix, AZ 85034
Search for other works by this author on:
B. Schenk
Honeywell Engines, Systems & Services,(1) APU Technology Development, 111 S. 34th Street, M/S 503-319, Phoenix, AZ 85034
Contributed by the International Gas Turbine Institute (IGTI) of THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS for publication in the ASME JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER. Paper presented at the International Gas Turbine and Aeroengine Congress and Exhibition, Munich, Germany, May 8–11, 2000; Paper 00-GT-532. Manuscript received by IGTI, Nov. 1999; final revision received by ASME Headquarters, Feb. 2000. Associate Editor: D. Wisler.
J. Eng. Gas Turbines Power. Jul 2002, 124(3): 617-626 (10 pages)
Published Online: June 19, 2002
Article history
Received:
November 1, 1999
Revised:
February 1, 2000
Online:
June 19, 2002
Citation
Schenk, B. (June 19, 2002). "Ceramic Turbine Engine Demonstration Project: A Summary Report ." ASME. J. Eng. Gas Turbines Power. July 2002; 124(3): 617–626. https://doi.org/10.1115/1.1417983
Download citation file:
Get Email Alerts
Cited By
Characterization of Knocking Pressure Data From Two Closely Spaced Transducers: Effect of Transducer Mounting
J. Eng. Gas Turbines Power (September 2025)
Comparison of a Full-Scale and a 1:10 Scale Low-Speed Two-Stroke Marine Engine Using Computational Fluid Dynamics
J. Eng. Gas Turbines Power (September 2025)
An Adjustable Elastic Support Structure for Vibration Suppression of Rotating Machinery
J. Eng. Gas Turbines Power (September 2025)
Related Articles
Summary of CGT302 Ceramic Gas Turbine Research and Development Program
J. Eng. Gas Turbines Power (July,2002)
F110-GE-132: Enhanced Power Through Low-Risk Derivative Technology
J. Turbomach (July,2001)
Ceramic Gas Turbine Technology Development
J. Eng. Gas Turbines Power (October,1995)
Rig and Engine Testing of Melt Infiltrated Ceramic Composites for Combustor and Shroud Applications
J. Eng. Gas Turbines Power (July,2002)
Related Proceedings Papers
Related Chapters
Why Do We Avoid Conflict?
Conflict Resolution: Concepts and Practice (The Technical Manager's Survival Guides)
Application of Mixed-Mode Fracture Criteria for Weakest-Link Failure Prediction for Ceramic Materials
Life Prediction Methodologies and Data for Ceramic Materials
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential