A generic training simulator of a natural gas combined cycle (NGCC) was modified to match operations at a real plant. The objective was to use the simulator to analyze cycling operations of the plant. Initial operation of the simulator revealed the potential for saturation conditions in the final high pressure superheater (HPSH) as the attemperator tried to control temperature at the superheater outlet during gas turbine loading and unloading. Subsequent plant operational data confirmed simulation results. Multiple simulations were performed during loading and unloading of the gas turbine to determine operational strategies that prevented saturation and increased the approach to saturation temperature. The solutions included changes to the attemperator temperature control setpoints and strategic control of the steam turbine (ST) inlet pressure control valve.

References

1.
Liese
,
E.
, and
Zitney
,
S. E.
,
2014
, “
A Dynamic Process Model of a NGCC—Model Development With Startup and Shutdown Simulations
,”
Energy Tech Magazine
, pp. 20–26.
2.
Liese
,
E. A.
, and
Zitney
,
S. E.
,
2013
, “
A Dynamic Process Model of a Natural Gas Combined Cycle—Model Development With Startup and Shutdown Simulations
,”
ASME
Paper No. POWER2013-98179.
3.
Lancaster
,
R.
,
2013
, “
Using a High-Fidelity Simulator to Study and Mitigate the Effects of Frequent Cycling and Extended Unit Shutdown on Large Coal Fired Units
,”
PowerPlantSim Conference
, Tampa, FL, Jan. 28–30.
4.
Pearson
,
J. M.
, and
Anderson
,
R.
,
2007
, “
Measurement of Damaging Thermal Transient in F-Class Horizontal HRSGs
,”
OMMI
,
4
(3), pp. 1–108.
You do not currently have access to this content.