In order to help manufacturing companies quantify and reduce product carbon footprints in a mixed model manufacturing system, a product carbon footprint-oriented multi-objective flexible job-shop scheduling optimization model is proposed. The production portion of the product carbon footprint, based on the mapping relations between products and the carbon emissions within the manufacturing system, is proposed to calculate the product carbon footprint in the mixed model manufacturing system. Nondominated sorting genetic algorithm-II (NSGA-II) is adopted to solve the proposed model. In order to help decision makers to choose the most suitable solution from the Pareto set as its execution solution, a method based on grades of product carbon footprints is proposed. Finally, the efficacy of the proposed model and algorithm are examined via a case study.

References

1.
Upham
,
P.
,
Dendler
,
L.
, and
Bleda
,
M.
,
2011
, “
Carbon Labelling of Grocery Products: Public Perceptions and Potential Emissions Reductions
,”
J. Cleaner Prod.
,
19
(
4
), pp.
348
355
.
2.
Wiedmann
,
T.
, and
Minx
,
J.
,
2008
, “
Definition of 'Carbon Footprint
,” Economics Research Trends, Nova Science Publishers, Hauppauge, NY.
3.
Fu
,
Z.
,
Jonathan
,
O.
, and
Sutherland
,
J. W.
,
2012
, “
Quantifying the Water Inventory of Machining Processes
,”
CIRP Ann. Manuf. Technol.
,
61
(
1
), pp.
67
70
.
4.
An
,
J.
, and
Xue
,
X. X.
,
2017
, “
Life-Cycle Carbon Footprint Analysis of Magnesia Products
,”
Resour. Conserv. Recycl.
,
119
, pp.
4
11
.
5.
Fang
,
K.
,
Uhan
,
N.
,
Zhao
,
F.
, and
Sutherland
,
J. W.
,
2011
, “
A New Approach to Scheduling in Manufacturing for Power Consumption and Carbon Footprint Reduction
,”
J. Manuf. Syst.
,
30
(
4
), pp.
234
240
.
6.
Zhang
,
H.
,
Zhao
,
F.
,
Fang
,
K.
, and
Sutherland
,
J. W.
,
2014
, “
Energy-Conscious Flow Shop Scheduling Under Time-of-Use Electricity Tariffs
,”
CIRP Ann. Manuf. Technol.
,
63
(
1
), pp.
37
40
.
7.
Dai
,
M.
,
Tang
,
D.
,
Giret
,
A.
,
Salido
,
M. A.
, and
Li
,
W. D.
,
2013
, “
Energy-Efficient Scheduling for a Flexible Flow Shop Using an Improved Genetic-Simulated Annealing Algorithm
,”
Rob. Comput. Integr. Manuf.
,
29
(
5
), pp.
418
429
.
8.
Hanafi
,
I.
,
Khamlichi
,
A.
,
Cabrera
,
F. M.
,
Almansa
,
E.
, and
Jabbouri
,
A.
,
2012
, “
Optimization of Cutting Conditions for Sustainable Machining of PEEK-CF30 Using TiN Tools
,”
J. Cleaner Prod.
,
33
, pp.
1
9
.
9.
Mayyas
,
A. T.
,
Oattawi
,
A.
,
Mayyas
,
A. R.
, and
Omar
,
M. A.
,
2012
, “
Life Cycle Assessment-Based Selection for a Sustainable Lightweight Body-in-White Design Energy
,”
Energy
,
39
(
1
), pp.
412
425
.
10.
Drake
,
R.
,
Yildirim
,
M. B.
,
Twomey
,
J.
,
Whitman
,
L.
,
Ahmad
,
J.
, and
Lodhia
,
P.
,
2006
, “
Data Collection Framework on Energy Consumption in Manufacturing
,”
IIE
Annual Conference and Exposition
, Orlando, FL, May 20–24.http://hdl.handle.net/10057/3422
11.
Zhang
,
R.
, and
Chiong
,
R.
,
2016
, “
Solving the Energy-Efficient Job Shop Scheduling Problem: A Multi-Objective Genetic Algorithm With Enhanced Local Search for Minimizing the Total Weighted Tardiness and Total Energy Consumption
,”
J. Cleaner Prod.
,
112
(
4
), pp.
3316
3375
.
12.
Guo
,
D. F.
, and
Li
,
T. K.
,
2007
, “
Constraint-Based Algorithm for Job Shop Scheduling
,”
Comput. Integr. Manufacturing Syst.
,
13
(
1
), pp.
117
125
(in Chinese).
13.
Deb
,
K.
,
Agrawal
,
S.
,
Pratap
,
A.
, and
Meyarivan
,
T.
,
2000
, “
A Fast Elitist Non-Dominated Sorting Genetic Algorithm for Multi-Objective Optimization: NSGA-II
,”
Sixth International Conference on Parallel Problem Solving From Nature
(
PPSN
), Paris, France, Sept. 18–20, pp.
849
858
.
14.
Zhang
,
C. Y.
,
Li
,
P. G.
,
Rao
,
Y. Q.
, and
Li
,
S. X.
,
2005
, “
A New Hybrid GA/SA Algorithm for the Job Shop Scheduling Problem
,” European Conference on Evolutionary Computation in Combinatorial Optimization (
EvoCOP
), Coimbra, Portugal, Apr. 5–7, pp.
246
259
.
15.
Vilcot
,
G.
, and
Billaut
,
J.-C.
,
2008
, “
A Tabu Search and a Genetic Algorithm for Solving a Bicriteria General Job Shop Scheduling Problem
,”
Eur. J. Oper. Res.
,
190
(
2
), pp.
398
411
.
16.
Wang
,
L.
, and
Zheng
,
D.-Z.
,
2002
, “
A Modified Genetic Algorithm for Job Shop Scheduling
,”
Int. J. Adv. Manuf. Technol.
,
20
(
1
), pp.
72
76
.
17.
Li
,
H.
,
1990
,
Mechanical Processing Handbook
,
Beijing Publishing House
,
Beijing, China
, pp.
856
976
(in Chinese).
18.
Leung
,
M.
,
Leung
,
Y.
, and
Chan
,
A.
,
2010
,
Carbon Audit Toolkit for Small and Medium Enterprises in Hong Kong
,
The University of Hong Kong
,
Hong Kong
.
You do not currently have access to this content.