In Korea, pressurized heavy water-cooled reactors (PHWR) account for 17% of operating units and have taken an important role in providing national energy supply. The recent biggest issue in domestic PHWR community was the continued operation of the Wolsong-1 CANada Deuterium Uranium (CANDU) plant, which has recently been approved to operate for 10 more years after a 30 year design life. In relation to this issue, various actions from both post-Fukushima lessons and Wolsong-1 (WS1) stress test results are being taken. In KAERI R&D, the following topics are studied to support the basis for these actions. First, PHWR severe accident issues such as (1) primary heat transport system (PHTS) overpressure protection capability, (2) containment overpressure protection capability, and (3) bypass source term are evaluated. Second, a computer tool (called MAAP–ISAAC) has been modified and updated to support analyzing Wolsong severe accident issues. Third, a decision supporting tool, called Severe Accident Management Expert (SAMEX)–CANDU, has been developed to aid emergency response experts under severe accident conditions.

References

1.
Fauske and Associates LLC
,
2005
, “
MAAP4 Modular Accident Analysis Program for LWR Power Plants User's Manual
,” EPRI, Burr Ridge, IL, Project No. RP3131-02.
2.
Gauntt
,
R. O.
, and
Cole
,
R. K.
,
2005
, “
MELCOR Computer Code Manuals Version 1.8.6
,” USNRC, Washington, DC, Report No. NUREG/CR-6119.
3.
Park
,
S. Y.
,
Kim
,
D. H.
, and
Song
,
Y. M.
,
2008
, “
Theory Manual for ISAAC Computer Code
,” Korea Atomic Energy Research Institute, Daejeon, South Korea, Report No. KAERI/TR-3648/2008.
4.
Jin
,
Y. H.
,
Kim
,
S. D.
, and
Park
,
S. Y.
,
2006
, “
Severe Accident Management Guidance for Pressurized Heavy Water Reactors
,” Korea Atomic Energy Research Institute, Daejeon, South Korea, Report No. KAERI/TR-3284/2006.
5.
Jin
,
Y. H.
,
Park
,
S. Y.
, and
Song
,
Y. M.
,
2009
, “
Application of Severe Accident Management Guidance in the Management of an SGTR Accident at the Wolsong Plants
,”
Nucl. Eng. Technol.
,
41
(
1
), pp.
63
70
.
6.
KEPCO
,
1995
, “
Wolsong Nuclear Power Plant Units No. 2/3/4 Final Safety Analysis Report
,” Report No. WSNPP-1.
7.
Chung
,
C.-H.
,
Cho
,
K. T.
,
Chang
,
S. W.
, and
Chung
,
H. J.
,
1996
, “
Evaluation of the Ultimate Pressure Capacity of the CANDU-6 Containment Using Material-Nonlinear Model
,”
J. Korean Soc. Civ. Eng.
,
16
(I-2), pp.
205
216
.
8.
Hahm
,
D.
,
Choi
,
I.-K.
, and
Lee
,
H.-P.
,
2010
, “
Assessment of the Internal Pressure Fragility of the CANDU Type Containment Building Using Nonlinear Finite Element Analysis
,”
J. Comput. Struct. Eng. Inst. Korea
,
23
(
5
), pp.
445
452
.
9.
KHNP
, 2013, “
Wolsong 1 Operating Manual for Containment Filtered Vent System
,” Korea Hydro and Nuclear Power Co., Seoul, South Korea, No. 87-73160-7057-001-DM-A.
10.
Song
,
Y. M.
,
Jeong
,
H. S.
,
Park
,
S. Y.
,
Kim
,
D. H.
, and
Song
,
J. H.
,
2013
, “
Overview of Containment Filtered Vent Under Severe Accident Conditions at Wolsong NPP Unit 1
,”
Nucl. Eng. Technol.
,
45
(
1
), pp.
597
604
.
11.
Nitheanandan
,
T.
, and
Brown
,
M. J.
,
2013
, “
Backup and Ultimate Heat Sinks in CANDU Reactors for Prolonged SBO Accidents
,”
Nucl. Eng. Technol.
,
45
(
5
), pp.
589
596
.
12.
KAERI
,
2008
, “
ISAAC Computer Code User's Manual
,” KAERI, Daejeon, South Korea, Report No. KAERI/TR-3645/2008.
13.
KHNP
,
2010
, “
Probabilistic Safety Assessment and Risk Monitoring System Development for Wolsong Unit 1 (Part 1: Probabilistic Safety Assessment for Wolsong Unit 1)
,” Rev. 2, Korea Hydro and Nuclear Power Co., Seoul, South Korea.