Abstract
This paper describes a real-time performance monitoring method based on PTC 4-2013 for determining instantaneous heat rates for coal-fired power plants. The calculation protocol uses a modified output–loss approach applied to a control volume that closely conforms to the boiler. The largest energy balance term is the heat transfer rate to the steam, which is known accurately in real-time when the plant employs properly calibrated instrumentation. The first-law energy balance also requires a balanced combustion equation which depends on coal composition, which is not known in real-time. A periodic or alert-driven calibration utilizes an ultimate analysis of a carefully collected coal sample and historic plant data obtained during the collection time of the coal sample. This is used to calculate correction factors for the coal mass flowrate, air preheater leakage, and CO2 and SO2 concentrations at the economizer exit derived from continuous emissions monitoring systems (CEMS) measurements performed at that location. The iterative calculations required to determine the coal composition in real-time are presented. The real-time performance algorithm exhibited significant sensitivity associated with measurements of the steam heat transfer rate, which was the dominant term in the overall boiler energy balance. Other input parameters generally yielded a much lower influence on calculated heat rate. It was concluded that for optimal accuracy of the output–loss method the steam and coal mass flowrates must be measured as accurately as possible.
Introduction
Heat rate is the parameter by which the performance of a coal-fueled electric generating unit (EGU) is evaluated. It is defined as the ratio of the rate at which energy is supplied to a unit to the power generated at that instant. The engineering units of heat rate are Btu/kW-h; such “mixed” units are prevalent throughout the power generation industry. Unit heat rate is a single-valued parameter; i.e., its assessment must yield a unique amount. The procedure for calculating the steam cycle heat rate appears to be uniform throughout the industry. However, the boiler efficiency that is calculated by the “loss method” does not follow a universal procedure, as acknowledged in ASME PTC 4. Many different values for the boiler efficiency are obtained for the same set of data, based on the choice of items to be included as output, items to be included as input, and the higher or lower heating value of the coal. Therefore, it is imperative to develop a standardized test method and calculation protocol for calculating the instantaneous heat rate in real-time. Once the instantaneous heat rate is available, hourly, daily, monthly, or annual values can be calculated.
This paper describes the equations used to characterize a real-time method to monitor the efficiency of coal-fired power plants. The method is based on PTC 4-2013 [1] and uses a modified output–loss approach applied to a control volume that closely conforms to the boiler. ASME PTC 4 requires the use of fuel analysis. However, most plants do not have the equipment to determine coal analysis on a real-time basis. This investigation demonstrates that it is possible to use CEMS data in lieu of coal analysis for calculating unit heat rate. A calibration procedure utilizes an ultimate analysis to describe the coal being burned during the calibration while holding the plant load and other factors steady. This permits the calculation of correction factors used during real-time performance monitoring, thereby yielding real-time estimates of coal composition and mass flowrate. Correction factors obtained from a calibration algorithm are used to adjust the CEMS measurements taken in the air preheater exit back to their values at the economizer exit, thereby accounting for dilution caused by air preheater leakage. Since the fuel composition is unknown, a series of iterative calculations are performed to back-calculate the coal composition, commencing from an initial estimate that the MAF coal is comprised entirely of carbon. The technique enables EGUs to utilize station CEMS data to monitor emissions and boiler control. It can easily be adopted in performance monitoring software, and thus provide real-time heat rate and CO2/MW analysis by standalone computers, CEMS systems, or distributed control systems (DCS). The ultimate goal of this paper is to describe an output–loss method used to evaluate heat rate in real-time that can be incorporated into ASME code standards. With this output–loss method being based on ASME PTC 4, it can be readily compared with the results of an ASME PTC 4 test. Other available performance testing methods do not work in real-time. The sole way to validate the results from one method is to compare with another method. The unique contribution of the output–loss method is that it represents the only power plant performance measurement approach that works in real-time that can be validated in a consistent and accurate manner.
The output–loss method was developed in Refs. [2,3], and further refined as discussed in Refs. [4–16]. There are several important features associated with the output/loss method; it is the only method that considers the coupling between the cycle heat rate and the boiler efficiency. Thus, the unit heat rate is calculated uniquely and accurately. A real-time algorithm based on the output–loss method that requires only permanent station CEMS sensors was reported in Ref. [17]. Per that investigation, the calculation protocol employs an initial calibration procedure. The calibration process therein utilizes historical data obtained during a designated test period where coal samples are collected at regular intervals. The calibration algorithm uses a coal ultimate analysis to describe the coal being burned during the calibration while holding the plant load and other factors steady. This provides exact information related to coal composition, fuel moisture, loss on ignition (LOI), etc. Thereafter, CO and O2 concentrations measured at the economizer exit are used to derive the balanced combustion equation. This permits the calculation of correction factors for the coal mass flowrate, air preheater leakage, and CO2 and SO2 concentrations at the economizer exit. These quantities are then supplied to a real-time performance monitoring algorithm [17]. The real-time algorithm (which is a CEMS-based method) employs measured CO2, CO, SO2, and O2 concentrations in the flue gas to infer the coal composition instantaneously, even in the absence of a recent ultimate analysis. The losses are calculated in a manner that is analogous to PTC 4-2013 on a per-pound of as-fired coal basis, as opposed to a percentage of higher heating value (HHV) of the coal, since that information is presumably not known in real-time. Measurements of feedwater flowrate, and steam temperatures and pressures entering and leaving the boiler are utilized to evaluate the steam heat transfer, i.e., the output. Implementation of this method assumes sufficient plant instrumentation and knowledge of a specific plant, including steam extractions, etc., are known and quantifiable to permit the calculation of heat transferred to the steam in real-time. It is demonstrated in the present paper that such information is sufficient to evaluate the unit heat rate on a real-time basis. This paper also provides details concerning real-time loss calculations. It likewise describes the iterative calculations required to infer the coal composition in real-time.
A case study to validate the real-time algorithm was reported in Ref. [17]. Power plant performance predictions of heat rate from the real-time algorithm were found to compare very closely to test data obtained using PTC 4-2013 test methods. It was shown that real-time performance assessments of instantaneous plant heat rate could be improved if the most current coal ultimate analysis was utilized. Likewise, the modified F-factor method was used in conjunction with the real-time algorithm [18] to calculate the mass flowrate of CO2 as a function of gross plant generation for a particular power plant. The resulting values were compared to similar data reported to EPA, but they did not demonstrate close agreement. The differences were attributed to the fact that the modified F-factor approach is based on actual conditions prevailing throughout the electric generation process, and does not rely on inaccurate stack gas volume flow measurements. However, the resulting heat rate values were identical to those obtained by a real-time performance monitoring algorithm, for the same input data.
Balanced Coal Combustion Reaction Equation
The output–loss method requires knowledge of the balanced chemical reaction equation for coal combustion with moist air. The composition of the coal being burned in an EGU can be determined by an ultimate analysis, but that procedure must be performed on a regular basis for the output–loss method to provide accurate predictions of boiler efficiency and heat rate. Even if the coal composition is presumably known from a recent ultimate analysis, the sample that was utilized for the measurement may not be entirely representative of the fuel being burned at any particular moment. Furthermore, the plant historian must be repeatedly updated to reflect the most current fuel composition. Hence there may be a limit on the accuracy of coal analyses in assessing combustion. The real-time algorithm of the output–loss method described in this paper provides means of estimating the coal composition by inference, based on prescribed CEMS measurements of flue gas species concentrations.
It is important to clearly establish the basis of coal composition measurements. Such analyses are often specified as follows: as-mined, as-fired, and as-received. Coal contains varying amounts of loosely held moisture and noncombustible materials (mineral ash). Two types of coal analyses are prevalent, i.e., proximate analysis and ultimate analysis. The experimental procedure employed in a proximate analysis is as follows: (i) a representative sample of coal is weighed, and then heated to a temperature sufficiently high to drive off the water, and then re-weighed: the fractional weight loss yields the coal moisture content “M,” (ii) the remaining material is then heated to a much higher temperature in the absence of oxygen to drive off gases; the fractional weight loss yields the volatile matter content “VM,” (iii) the remainder of the sample is then burned in the air until only noncombustibles remain; the fractional weight loss yields the fixed carbon content “FC,” and (iv) the remaining material is identified as noncombustible mineral matter or ash “A.” A proximate analysis is typically reported as percentages (or fractions) of the four quantities, i.e., moisture, volatile matter, fixed carbon, and ash. An ultimate coal analysis provides the elemental weight fractions of carbon, hydrogen, nitrogen, oxygen, and sulfur. Typically the ash content and heating value of the coal may also be provided. Data from a moisture and ash-free analysis can be converted to another basis by using the basis adjustment factor MAF = 1 − A − M.
Coal Combustion.
As a solid fuel, coal is typically burned by one of two methods. For stoker-fired boilers the coal is burned in chunk form on a stationary or moving grate; the air is usually supplied from below with combustion gasses passing upward and ash falling through the stationary grate (or dropping off the end of a moving grate). For pulverized coal boilers (PCB), coal is crushed to a fine particle size prior to firing; wall-mounted burners mix the coal particles with air and promote high turbulence to ensure thorough mixing and high combustion efficiency.
Since the combustion equation is derived on the basis of one mole of fuel carbon, it is understood that all molar coefficients are expressed per mole of fuel carbon.
The amount of excess air present in the combustion process is significant in characterizing combustion efficiency. Note that the presence of excess air implies there is more than the minimum amount of oxygen required for complete combustion. Its presence results in efficiency loss since the combustion energy released per unit mass of coal is constant, and that energy must then be used to heat the unused oxygen and accompanying nitrogen. Increasing the excess air reduces the flame temperature, which ultimately reduces the driving potential for heat transfer in the boiler. Every burner in the furnace requires some excess air to ensure the delivery and complete mixing of air and fuel and to maximize combustion of the fuel. If the coal composition is known by means of an ultimate analysis, and presuming CEMS data for %O2 and ppm CO is available at the economizer exit, and furthermore given knowledge of such auxiliary quantities as ambient air moisture and LOI, the molar coefficients for Eq. (1) can be determined. That yields sufficient information to evaluate the thermal losses associated with the boiler; which is discussed in more detail subsequently.
Output–Loss Method
This paper describes a calculation procedure (based on ASME PTC 4-2013) and a real-time performance monitoring method for determining and reporting EGU heat rate. The method can also be utilized in conjunction with a modified F-factor approach, as outlined in Ref. [18], to determine CO2 emissions per MW of generation for fossil fuel power plants. A calibration algorithm utilizes coal composition data obtained from limited plant CEMS data and a current ultimate analysis to balance the coal combustion equation. Therein empirical correction factors for the coal mass flowrate and air preheater leakage are determined. Likewise, the calibration algorithm calculates additional correction factors that are used to convert CEMS concentration data for SO2 and CO2, performed downstream of the air preheater and before any scrubbers, back to their presumed values at the economizer outlet. It is noted that molar concentrations of the combustion products downstream of a scrubber are not representative of their values at the boiler exit. In every instance, the correction factors are provided to the real-time algorithm for further processing. A real-time algorithm utilizes the correction factors and CEMS data to analyze the composition of the combustion products at the control volume boundary of the boiler. Based on that knowledge, several terms in the combustion equation are approximated based on the most recent ultimate analysis, to deduce the as-fired coal composition and the coal mass flowrate in real-time.
Consider the schematic diagram of the system modeled by the output–loss method, as shown in Fig. 1. Flow rate, pressure, and temperature data for the feed water, main steam, cold reheat steam, and hot reheat steam are needed to calculate the steam heat transfer . In many instances, the cold reheat steam flowrate is not measured directly. In such cases, it can be calculated by taking into account the extraction for the feed water heater. Likewise, it may be necessary to consider the utilization of attemperators in a power plant, which is used to control the temperature of superheated steam at various points throughout the cycle. Often this is accomplished by spraying water into a pipe located between superheater stages or upstream of a reheater inlet. Other coal-fired EGUs may have a different system diagram, and it is assumed that the thermodynamic analysis and sensor data are available to calculate an accurate value for .
Output–Loss Method Energy Calculations.
The left-hand side of Eq. (12) denotes the “input,” whereas represents the “output.” The terms in square brackets indicate the “losses.” As described subsequently, in this investigation the losses are calculated on a per unit mass of as-fired coal basis. Hence, the evaluation of energy loss rates is predicated on the assumption that either the coal mass flowrate is known or can be solved for algebraically. To calculate the losses per unit mass of coal, the balanced chemical reaction equation must first be obtained as outlined previously.
Dry Flue Gas Loss.
Similar expressions can likewise be applied to evaluate the mass fractions of the primary and secondary air streams.
Moisture in Air Loss.
Fuel Moisture Loss.
Hydrogen Burning Loss.
Unburned Carbon Loss.
CO Formation Loss.
Fly Ash and Bottom Ash Loss.
Surface Radiation and Convection Loss.
An alternate approach to evaluating the surface radiation and convection loss can likewise be found in Ref. [1]. However, that method requires knowledge of the projected surface area of the boiler. Such information may not be readily available to plant operators. In contrast, the boiler output is readily obtained, thereby motivating the utilization of the curve-fit approach herein described.
Calibration Algorithm.
Real-Time Algorithm.
Likewise, plant data for ambient pressure and relative humidity are used to evaluate the moisture in air. Measurements of CO2 and SO2 mole fractions performed at the air preheater exit are corrected back to their presumed values at the economizer exit based on Eqs. (56) and (57), thereby accounting for dilution caused by air preheater leakage. The real-time algorithm accesses plant data for such quantities as the primary, secondary, and leakage air temperatures, as well as the temperatures associated with the bottom ash and the flue gases at the economizer exit. This information is sufficient to determine the thermal losses per unit mass of coal ℓ, as described previously. Steam-side pressure, temperature, and mass flowrate data acquired from plant data are used to calculate the output . This enables the calculation of plant performance parameters as described by Eqs. (7)–(10).
In this instance, the apparent molecular weight of moisture and ash-free coal (per unit mole of fuel carbon) is given by
Subsequently, an additional assessment of the number of moles of each species in the fuel is performed. The iterative calculations described by Eqs. (63)–(77) are continued until no further changes in fuel composition are observed, thereby yielding a close approximation to actual coal ultimate analysis.
Therein, the iterative calculations as characterized by Eqs. (63)–(77) proceed as outlined previously, but with Dwet being replaced by Ddry in every instance. Convergence is attained when the calculated coal composition no longer changes, within a specified tolerance; this is typically achieved within five iterations.
Sensitivity Analysis
The calibration and real-time algorithms of the output–loss method rely on having accurate input data to provide reliable predictions of such quantities as boiler efficiency, heat rate, modified F-factor, etc. In general, the input variables may be subject to a range of both bias and precision errors, which eventually result in uncertainties associated with the calculated performance parameters. Hence, for this investigation sensitivity analyses were conducted to determine the effects of varying key input data over a prescribed range to estimate how their respective uncertainties affect model calculations. This likewise served the purpose of predicting trends in coal-fired EGU performance as influenced by those particular variables. Due to the large number of input variables required by the output–loss model, simultaneous variations of all model inputs were deemed to be impractical. Two separate sensitivity analyses were performed. One consisted of varying the ultimate analysis of the coal, while the second consisted of varying dynamic parameters over a range of measurement uncertainties.
In Ref. [17], results from an output–loss model validation study were reported. For that investigation, representative data from a coal-fired EGU were utilized to calculate boiler efficiency and heat rate over a range of plant loads. The performance predictions were likewise compared to values that were obtained by testing that conformed with PTC 4 test procedures. Table 1 (taken from Ref. [17]) summarizes static data that were employed in that investigation. Table 2 contains ultimate analysis results and calorific data for each load case previously reported in Ref. [17]. The corresponding dynamic data shown in Table 3 were likewise provided in Ref. [17]; they represent measured values that were obtained during the period in which the coal samples used for the ultimate analysis were evaluated. It is anticipated that dynamic data will likely exhibit temporal variability. Referring to Ref. [17], it was noted that the oxygen and carbon monoxide measurements were performed at the economizer exit, whereas the carbon dioxide and sulfur dioxide measurements were performed at the air preheater exit. For the present sensitivity analysis, the 400 MW load data were selected as the baseline case. Therein, selected parameters that were expected to significantly impact output–loss model calculations were systematically adjusted from their baseline values to assess the resulting effects on predictions obtained using the calibration and real-time algorithms.
Static data [17]
BLRLK (%) | AIRCOAL kg/kg (lbm/lbm) | LOI (%) | FLYASH (%) | Tash °C (°F) |
---|---|---|---|---|
1.5 | 2 | 0.5 | 88 | 1093 (2000) |
BLRLK (%) | AIRCOAL kg/kg (lbm/lbm) | LOI (%) | FLYASH (%) | Tash °C (°F) |
---|---|---|---|---|
1.5 | 2 | 0.5 | 88 | 1093 (2000) |
Ultimate analysis [17]
Boiler load (MW) | |||||
---|---|---|---|---|---|
Components | VWO | 400 | 350 | 280 | 200 |
C (%) | 63.12 | 62.78 | 65.1 | 64.31 | 64.99 |
H (%) | 4.24 | 4.14 | 4.21 | 4.24 | 4.41 |
S (%) | 2.00 | 2.30 | 2.54 | 2.48 | 2.75 |
O (%) | 7.06 | 7.66 | 6.86 | 7.01 | 7.33 |
N (%) | 1.27 | 1.27 | 1.30 | 1.29 | 1.31 |
Fuel moisture (%) | 13.07 | 13.7 | 11.99 | 12.15 | 10.99 |
ASH (%) | 8.5 | 8.15 | 8.00 | 8.52 | 8.22 |
HHV kJ/kg (Btu/lbm) | 26,195 (11,262) | 26,186 (11,258) | 26,809 (11,526) | 26,677 (11,469) | 27,184 (11,687) |
Boiler load (MW) | |||||
---|---|---|---|---|---|
Components | VWO | 400 | 350 | 280 | 200 |
C (%) | 63.12 | 62.78 | 65.1 | 64.31 | 64.99 |
H (%) | 4.24 | 4.14 | 4.21 | 4.24 | 4.41 |
S (%) | 2.00 | 2.30 | 2.54 | 2.48 | 2.75 |
O (%) | 7.06 | 7.66 | 6.86 | 7.01 | 7.33 |
N (%) | 1.27 | 1.27 | 1.30 | 1.29 | 1.31 |
Fuel moisture (%) | 13.07 | 13.7 | 11.99 | 12.15 | 10.99 |
ASH (%) | 8.5 | 8.15 | 8.00 | 8.52 | 8.22 |
HHV kJ/kg (Btu/lbm) | 26,195 (11,262) | 26,186 (11,258) | 26,809 (11,526) | 26,677 (11,469) | 27,184 (11,687) |
Dynamic measured data [17]
Variable | Boiler load (MW) | ||||
---|---|---|---|---|---|
VWO | 400 | 350 | 280 | 200 | |
Tamb °C (°F) | 31.8 (89.2) | 28.6 (83.5) | 28.2 (82.8) | 28.5 (83.3) | 26.8 (80.2) |
Relative humidity (%) | 79.7 | 71.9 | 74.2 | 76.4 | 75.8 |
TPA (°F) | 76.7 (170) | 76.7 (170) | 76.7 (170) | 76.7 (170) | 76.7 (170) |
TSA (°F) | 326.6 (619.8) | 311.2 (592.2) | 301.5 (574.7) | 298.1 (568.6) | 288.8 (551.8) |
TLA (°F) | 384.9 (724.9) | 360.7 (681.3) | 344.8 (652.6) | 340.4 (644.7) | 325.1 (617.2) |
kW (Btu/h) | 1.08 × 106 (3.70 × 109) | 0.92 × 106 (3.15 × 109) | 0.81 × 106 (2.78 × 109) | 0.66 × 106 (2.25 × 109) | 0.49 × 106 (1.66 × 109) |
kg/h (ton/h) | 1.66 × 105 (182.8) | 1.41 × 105 (155.0) | 1.21 × 105 (133.6) | 0.98 × 105 (108.4) | 0.71 × 105 (78.6) |
yO2 (%) | 3.33 | 2.98 | 3.97 | 3.52 | 4.15 |
yCO (ppm) | 13.7 | 154.7 | 151.3 | 137.5 | 9.1 |
yCO2 (%) | 13.8 | 14.1 | 14.0 | 13.8 | 12.8 |
ySO2 (ppm) | 2395.9 | 2417.1 | 2396.8 | 2400.0 | 2400.0 |
Variable | Boiler load (MW) | ||||
---|---|---|---|---|---|
VWO | 400 | 350 | 280 | 200 | |
Tamb °C (°F) | 31.8 (89.2) | 28.6 (83.5) | 28.2 (82.8) | 28.5 (83.3) | 26.8 (80.2) |
Relative humidity (%) | 79.7 | 71.9 | 74.2 | 76.4 | 75.8 |
TPA (°F) | 76.7 (170) | 76.7 (170) | 76.7 (170) | 76.7 (170) | 76.7 (170) |
TSA (°F) | 326.6 (619.8) | 311.2 (592.2) | 301.5 (574.7) | 298.1 (568.6) | 288.8 (551.8) |
TLA (°F) | 384.9 (724.9) | 360.7 (681.3) | 344.8 (652.6) | 340.4 (644.7) | 325.1 (617.2) |
kW (Btu/h) | 1.08 × 106 (3.70 × 109) | 0.92 × 106 (3.15 × 109) | 0.81 × 106 (2.78 × 109) | 0.66 × 106 (2.25 × 109) | 0.49 × 106 (1.66 × 109) |
kg/h (ton/h) | 1.66 × 105 (182.8) | 1.41 × 105 (155.0) | 1.21 × 105 (133.6) | 0.98 × 105 (108.4) | 0.71 × 105 (78.6) |
yO2 (%) | 3.33 | 2.98 | 3.97 | 3.52 | 4.15 |
yCO (ppm) | 13.7 | 154.7 | 151.3 | 137.5 | 9.1 |
yCO2 (%) | 13.8 | 14.1 | 14.0 | 13.8 | 12.8 |
ySO2 (ppm) | 2395.9 | 2417.1 | 2396.8 | 2400.0 | 2400.0 |
In Eq. (79), for a given coal sample, “C” denotes the weight fraction of carbon in coal, “H” is the weight fraction of molecular hydrogen, “O” refers to the weight fraction of molecular oxygen, and “S” is the sulfur weight fraction. In Table 4, coal higher heating values acquired from a laboratory ultimate analysis are compared to those obtained using the Dulong equation, for the cases originally considered in Ref. [17]. In every instance the results obtained by both approaches differ by no more than 1.4%, implying that Dulong's formula provided adequate predictions. This comparison was performed to facilitate subsequent parametric studies, where the coal composition was varied over a range, in order to investigate the influence of coal composition uncertainty.
Dulong equation HHV analysis
HHV (kJ/kg) (Btu/Lbm) | Load (MW) | ||||
---|---|---|---|---|---|
VWO | 400 | 350 | 280 | 200 | |
Ultimate | 26,195 (11,262) | 26,186 (11,258) | 26,809 (11,526) | 26,677 (11,469) | 27,184 (11,687) |
Dulong | 26,465 (11,378) | 26,126 (11,232) | 27,182 (11,686) | 26,923 (11,575) | 27,368 (11,766) |
% Difference | +1.03 | −0.23 | +1.39 | +0.92 | +0.68 |
HHV (kJ/kg) (Btu/Lbm) | Load (MW) | ||||
---|---|---|---|---|---|
VWO | 400 | 350 | 280 | 200 | |
Ultimate | 26,195 (11,262) | 26,186 (11,258) | 26,809 (11,526) | 26,677 (11,469) | 27,184 (11,687) |
Dulong | 26,465 (11,378) | 26,126 (11,232) | 27,182 (11,686) | 26,923 (11,575) | 27,368 (11,766) |
% Difference | +1.03 | −0.23 | +1.39 | +0.92 | +0.68 |
For example, if the measured weight fraction of a particular species is too high, then xi is positive. In that case, by Eq. (80) it is assumed that the other component weight fractions will decrease by their nominal value, multiplied by the correction factor. Conversely, if the weight fraction of a certain component has too low of a measured value, then xi is negative. Therein, Eq. (80) implies that the weight fractions of the other species will increase in a similar manner.
Table 5 summarizes the effects of uncertainties associated with the ultimate analysis of the coal sample for the 400 MW baseline case, considering prescribed variations associated with carbon, hydrogen, sulfur, oxygen, nitrogen, moisture, and ash composition of the fuel. In each instance, for ±10% uncertainties associated with the weight fraction of a particular coal constituent, the remaining weight fractions were corrected accordingly using Eq. (80). In every instance the static data were acquired from Table 1, and the dynamic data were taken from Table 3 (for the 400 MW baseline case). The higher heating value for the baseline case was taken from Table 2; it was measured by methods that conformed to PTC 4; refer to Ref. [21]. However, when the fuel composition was adjusted for the sensitivity analysis, the higher heating values were re-calculated using Dulong's equation, i.e., Eq. (79). Therein, the calibration algorithm was utilized to assess the influence of uncertainties associated with fuel composition on several key calculated performance parameters. For each case, the CO2 and SO2 correction factors were calculated by means of Eqs. (56) and (57), respectively. Likewise, the coal mass flow correction factor was determined using Eq. (55). The effects of coal composition uncertainty on the predicted air preheater leakage are also included in Table 5. Based on these calculated correction factors, for each presumed coal composition the calibration algorithm evaluated the corrected coal mass flowrate per Eq. (55). Likewise, the boiler efficiency was calculated using Eq. (7), and the gross heat rate and net heat rate were evaluated by means of Eqs. (9) and (10), respectively.
Ultimate analysis effects on boiler performance calculated using the calibration algorithm
Parameter | Variation | HHV Dulong kJ/kg (Btu/lbm) | CO2 Cor. Fac | SO2 Cor. Fac | Coal Fl Cor. Fac | AP Leak % | kg/h (ton/h) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|---|---|
C | −10% | 24,804 (10,664) | 0.920 | 0.883 | 1.079 | 7.7 | 1.52 × 105 (167.3) | 88.23 | 8928 | 9724 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 27,447 (11,800) | 0.862 | 1.423 | 0.950 | 14.4 | 1.34 × 105 (147.2) | 90.60 | 8694 | 9469 | |
H | −10% | 25,616 (11,013) | 0.875 | 1.091 | 1.029 | 12.8 | 1.45 × 105 (159.5) | 89.63 | 8789 | 9572 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 26,635 (11,451) | 0.901 | 1.123 | 0.993 | 9.8 | 1.40 × 105 (153.9) | 89.33 | 8817 | 9604 | |
S | −10% | 26,165 (11,249) | 0.887 | 1.232 | 1.009 | 11.4 | 1.42 × 105 (156.4) | 89.48 | 8803 | 9588 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 26,086 (11,215) | 0.889 | 1.006 | 1.012 | 11.2 | 1.42 × 105 (156.9) | 89.47 | 8804 | 9589 | |
O | −10% | 26,493 (11,390) | 0.891 | 1.111 | 0.996 | 10.9 | 1.40 × 105 (154.3) | 89.56 | 8795 | 9579 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 25,760 (11,075) | 0.885 | 1.103 | 1.026 | 11.6 | 1.44 × 105 (159.0) | 89.39 | 8812 | 9598 | |
N | −10% | 26,160 (11,247) | 0.888 | 1.107 | 1.009 | 11.3 | 1.42 × 105 (156.4) | 89.48 | 8803 | 9588 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 26,093 (11,218) | 0.888 | 1.108 | 1.012 | 11.3 | 1.42 × 105 (156.8) | 89.47 | 8804 | 9589 | |
FM | −10% | 26,540 (11,410) | 0.888 | 1.107 | 0.992 | 11.3 | 1.40 × 105 (153.8) | 89.68 | 8783 | 9567 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 25,712 (11,054) | 0.888 | 1.107 | 1.029 | 11.3 | 1.45 × 105 (159.5) | 89.27 | 8824 | 9611 | |
ASH | −10% | 26,358 (11,332) | 0.888 | 1.107 | 1.001 | 11.3 | 1.41 × 105 (155.2) | 89.51 | 8800 | 9585 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 25,895 (11,133) | 0.888 | 1.107 | 1.020 | 11.3 | 1.43 × 105 (158.1) | 89.44 | 8807 | 9592 |
Parameter | Variation | HHV Dulong kJ/kg (Btu/lbm) | CO2 Cor. Fac | SO2 Cor. Fac | Coal Fl Cor. Fac | AP Leak % | kg/h (ton/h) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|---|---|
C | −10% | 24,804 (10,664) | 0.920 | 0.883 | 1.079 | 7.7 | 1.52 × 105 (167.3) | 88.23 | 8928 | 9724 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 27,447 (11,800) | 0.862 | 1.423 | 0.950 | 14.4 | 1.34 × 105 (147.2) | 90.60 | 8694 | 9469 | |
H | −10% | 25,616 (11,013) | 0.875 | 1.091 | 1.029 | 12.8 | 1.45 × 105 (159.5) | 89.63 | 8789 | 9572 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 26,635 (11,451) | 0.901 | 1.123 | 0.993 | 9.8 | 1.40 × 105 (153.9) | 89.33 | 8817 | 9604 | |
S | −10% | 26,165 (11,249) | 0.887 | 1.232 | 1.009 | 11.4 | 1.42 × 105 (156.4) | 89.48 | 8803 | 9588 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 26,086 (11,215) | 0.889 | 1.006 | 1.012 | 11.2 | 1.42 × 105 (156.9) | 89.47 | 8804 | 9589 | |
O | −10% | 26,493 (11,390) | 0.891 | 1.111 | 0.996 | 10.9 | 1.40 × 105 (154.3) | 89.56 | 8795 | 9579 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 25,760 (11,075) | 0.885 | 1.103 | 1.026 | 11.6 | 1.44 × 105 (159.0) | 89.39 | 8812 | 9598 | |
N | −10% | 26,160 (11,247) | 0.888 | 1.107 | 1.009 | 11.3 | 1.42 × 105 (156.4) | 89.48 | 8803 | 9588 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 26,093 (11,218) | 0.888 | 1.108 | 1.012 | 11.3 | 1.42 × 105 (156.8) | 89.47 | 8804 | 9589 | |
FM | −10% | 26,540 (11,410) | 0.888 | 1.107 | 0.992 | 11.3 | 1.40 × 105 (153.8) | 89.68 | 8783 | 9567 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 25,712 (11,054) | 0.888 | 1.107 | 1.029 | 11.3 | 1.45 × 105 (159.5) | 89.27 | 8824 | 9611 | |
ASH | −10% | 26,358 (11,332) | 0.888 | 1.107 | 1.001 | 11.3 | 1.41 × 105 (155.2) | 89.51 | 8800 | 9585 |
Nominal | 26,186 (11,258) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.50 | 8801 | 9586 | |
10% | 25,895 (11,133) | 0.888 | 1.107 | 1.020 | 11.3 | 1.43 × 105 (158.1) | 89.44 | 8807 | 9592 |
Table 6 likewise characterizes the influence of uncertainties associated with the coal sample ultimate analysis for the 400 MW baseline case. However, in these instances, the real-time algorithm was utilized to predict such quantities as boiler efficiency and heat rate. As before, the static data were taken from Table 1, and the dynamic data were based on values from Table 3. However, for each coal composition, the real-time algorithm employed the CO2 and SO2 correction factors, the coal mass flowrate correction factor, and the air preheater leakage value, as calculated previously by the calibration algorithm specifically for the baseline case.
Ultimate analysis effects on boiler performance calculated using the real-time algorithm
Parameter | Variation | HHV Dulong (Btu/lbm) | CO2 Cor. Fac | SO2 Cor. Fac | Coal Flow Cor. Fac | AP Leak % | kg/h (ton/h) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|---|---|
C | −10% | 24,804 (10,664) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.51 | 8799 | 9584 |
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 27,447 (11,800) | 89.48 | 8802 | 9587 | ||||||
H | −10% | 25,616 (11,013) | 89.50 | 8800 | 9585 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 26,635 (11,451) | 89.50 | 8801 | 9586 | ||||||
S | −10% | 26,165 (11,249) | 89.50 | 8801 | 9586 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 26,086 (11,215) | 89.50 | 8801 | 9586 | ||||||
O | −10% | 26,493 (11,390) | 89.52 | 8799 | 9584 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 25,760 (11,075) | 89.48 | 8803 | 9588 | ||||||
N | −10% | 26,160 (11,247) | 89.49 | 8802 | 9587 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 26,093 (11,218) | 89.51 | 8800 | 9585 | ||||||
FM | −10% | 26,540 (11,410) | 89.54 | 8797 | 9582 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 25,712 (11,054) | 89.46 | 8804 | 9589 | ||||||
ASH | −10% | 26,358 (11,332) | 89.45 | 8806 | 9591 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 25,895 (11,133) | 89.55 | 8796 | 9580 |
Parameter | Variation | HHV Dulong (Btu/lbm) | CO2 Cor. Fac | SO2 Cor. Fac | Coal Flow Cor. Fac | AP Leak % | kg/h (ton/h) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|---|---|
C | −10% | 24,804 (10,664) | 0.888 | 1.107 | 1.008 | 11.3 | 1.42 × 105 (156.2) | 89.51 | 8799 | 9584 |
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 27,447 (11,800) | 89.48 | 8802 | 9587 | ||||||
H | −10% | 25,616 (11,013) | 89.50 | 8800 | 9585 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 26,635 (11,451) | 89.50 | 8801 | 9586 | ||||||
S | −10% | 26,165 (11,249) | 89.50 | 8801 | 9586 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 26,086 (11,215) | 89.50 | 8801 | 9586 | ||||||
O | −10% | 26,493 (11,390) | 89.52 | 8799 | 9584 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 25,760 (11,075) | 89.48 | 8803 | 9588 | ||||||
N | −10% | 26,160 (11,247) | 89.49 | 8802 | 9587 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 26,093 (11,218) | 89.51 | 8800 | 9585 | ||||||
FM | −10% | 26,540 (11,410) | 89.54 | 8797 | 9582 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 25,712 (11,054) | 89.46 | 8804 | 9589 | ||||||
ASH | −10% | 26,358 (11,332) | 89.45 | 8806 | 9591 | |||||
Nominal | 26,186 (11,258) | 89.50 | 8801 | 9586 | ||||||
10% | 25,895 (11,133) | 89.55 | 8796 | 9580 |
Table 7 summarizes the influence of uncertainties associated with the dynamic data employed in the 400 MW baseline case, considering a ±10% range of measurement errors for each parameter. These results for such performance parameters as boiler efficiency and heat rate were calculated using the calibration algorithm. In every instance, the dynamic data nominal values were taken from Table 2 for the 400 MW baseline case. Likewise, the static data were based on values provided in Table 1, whereas the coal composition and fuel higher heating value conformed to those listed in Table 3 for the 400 MW case. By contrast, Table 8 recapitulates boiler efficiency and heat rates calculated by the real-time algorithm, where CO2 and SO2 correction factors, the coal mass flowrate correction factor, and the air preheater leakage value previously determined by the calibration algorithm were utilized, as calculated for the 400 MW baseline case.
Dynamic variables effects on boiler performance calculated using the calibration algorithm
Parameter | Variation | CO2 Cor. Fac | SO2 Cor. Fac | Coal Flow Cor. Fac | AP Leakage (%) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|
Tamb | −10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.52 | 8799 | 9583 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.47 | 8804 | 9589 | |
RH | −10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.51 | 8800 | 9585 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.49 | 8802 | 9587 | |
TPA | −10% | 0.888 | 1.107 | 1.010 | 11.3 | 89.34 | 8817 | 9603 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.006 | 11.3 | 89.66 | 8785 | 9568 | |
TSA | −10% | 0.888 | 1.107 | 1.019 | 11.3 | 88.49 | 8901 | 9695 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 0.997 | 11.3 | 90.52 | 8702 | 9478 | |
yO2 | −10% | 0.874 | 1.089 | 1.007 | 12.9 | 89.53 | 8797 | 9582 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.903 | 1.126 | 1.008 | 9.6 | 89.46 | 8805 | 9590 | |
yCO | −10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.51 | 8800 | 9585 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.49 | 8801 | 9586 | |
yCO2 | −10% | 0.799 | 1.107 | 1.008 | 22.5 | 89.50 | 8801 | 9586 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.977 | 1.107 | 1.008 | 2.1 | 89.50 | 8,801 | 9586 | |
ySO2 | −10% | 0.888 | 0.997 | 1.008 | 11.3 | 89.50 | 8801 | 9586 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.218 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
−10% | 0.888 | 1.107 | 0.907 | 11.3 | 89.48 | 7923 | 8629 | |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.108 | 11.3 | 89.52 | 9679 | 10,542 | |
−10% | 0.888 | 1.107 | 1.120 | 11.3 | 89.50 | 8801 | 9586 | |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 0.916 | 11.3 | 89.50 | 8801 | 9586 |
Parameter | Variation | CO2 Cor. Fac | SO2 Cor. Fac | Coal Flow Cor. Fac | AP Leakage (%) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|
Tamb | −10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.52 | 8799 | 9583 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.47 | 8804 | 9589 | |
RH | −10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.51 | 8800 | 9585 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.49 | 8802 | 9587 | |
TPA | −10% | 0.888 | 1.107 | 1.010 | 11.3 | 89.34 | 8817 | 9603 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.006 | 11.3 | 89.66 | 8785 | 9568 | |
TSA | −10% | 0.888 | 1.107 | 1.019 | 11.3 | 88.49 | 8901 | 9695 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 0.997 | 11.3 | 90.52 | 8702 | 9478 | |
yO2 | −10% | 0.874 | 1.089 | 1.007 | 12.9 | 89.53 | 8797 | 9582 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.903 | 1.126 | 1.008 | 9.6 | 89.46 | 8805 | 9590 | |
yCO | −10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.51 | 8800 | 9585 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.008 | 11.3 | 89.49 | 8801 | 9586 | |
yCO2 | −10% | 0.799 | 1.107 | 1.008 | 22.5 | 89.50 | 8801 | 9586 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.977 | 1.107 | 1.008 | 2.1 | 89.50 | 8,801 | 9586 | |
ySO2 | −10% | 0.888 | 0.997 | 1.008 | 11.3 | 89.50 | 8801 | 9586 |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.218 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
−10% | 0.888 | 1.107 | 0.907 | 11.3 | 89.48 | 7923 | 8629 | |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 1.108 | 11.3 | 89.52 | 9679 | 10,542 | |
−10% | 0.888 | 1.107 | 1.120 | 11.3 | 89.50 | 8801 | 9586 | |
Nominal | 0.888 | 1.107 | 1.008 | 11.3 | 89.50 | 8801 | 9586 | |
10% | 0.888 | 1.107 | 0.916 | 11.3 | 89.50 | 8801 | 9586 |
Dynamic variables effects on boiler performance calculated using the real-time algorithm
Parameter | Variation | CO2 Cor. Fac | SO2 Cor. Fac | Coal Flow Cor. Fac | AP Leakage (%) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|
Tamb | −10% | 0.888 | 1.107 | 0.996 | 11.3 | 89.52 | 8799 | 9584 |
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.47 | 8804 | 9589 | |||||
RH | −10% | 89.51 | 8800 | 9585 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.49 | 8802 | 9587 | |||||
TPA | −10% | 89.35 | 8815 | 9601 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.65 | 8787 | 9570 | |||||
TSA | −10% | 88.60 | 8890 | 9682 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 90.42 | 8711 | 9488 | |||||
yO2 | −10% | 89.18 | 8833 | 9620 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.83 | 8769 | 9551 | |||||
yCO | −10% | 89.50 | 8801 | 9585 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.50 | 8801 | 9586 | |||||
yCO2 | −10% | 87.30 | 9022 | 9827 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 91.55 | 8604 | 9372 | |||||
ySO2 | −10% | 89.46 | 8804 | 9590 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.54 | 8797 | 9582 | |||||
−10% | 88.44 | 8015 | 8730 | |||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 90.38 | 9587 | 10,442 | |||||
−10% | 90.45 | 8709 | 9485 | |||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 88.57 | 8893 | 9686 |
Parameter | Variation | CO2 Cor. Fac | SO2 Cor. Fac | Coal Flow Cor. Fac | AP Leakage (%) | ηb (%) | HRGross (Btu/kW-h) | HRNet (Btu/kW-h) |
---|---|---|---|---|---|---|---|---|
Tamb | −10% | 0.888 | 1.107 | 0.996 | 11.3 | 89.52 | 8799 | 9584 |
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.47 | 8804 | 9589 | |||||
RH | −10% | 89.51 | 8800 | 9585 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.49 | 8802 | 9587 | |||||
TPA | −10% | 89.35 | 8815 | 9601 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.65 | 8787 | 9570 | |||||
TSA | −10% | 88.60 | 8890 | 9682 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 90.42 | 8711 | 9488 | |||||
yO2 | −10% | 89.18 | 8833 | 9620 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.83 | 8769 | 9551 | |||||
yCO | −10% | 89.50 | 8801 | 9585 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.50 | 8801 | 9586 | |||||
yCO2 | −10% | 87.30 | 9022 | 9827 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 91.55 | 8604 | 9372 | |||||
ySO2 | −10% | 89.46 | 8804 | 9590 | ||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 89.54 | 8797 | 9582 | |||||
−10% | 88.44 | 8015 | 8730 | |||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 90.38 | 9587 | 10,442 | |||||
−10% | 90.45 | 8709 | 9485 | |||||
Nominal | 89.50 | 8801 | 9586 | |||||
10% | 88.57 | 8893 | 9686 |
Conclusions
For an EGR unit with a boiler efficiency of approximately 90%, the output–loss method described in this investigation exhibited significant sensitivity associated with measured values of . This was expected since the steam heat transfer rate was the dominant term in the overall boiler energy balance. Other input parameters generally yielded a much lower influence on calculated heat rate. Referring to Table 4, the Dulong equation, i.e., Eq. (79), predicted the coal higher heating values for the fuels studies in Ref. [17] with an accuracy of ±1.4%, thus bolstering confidence in the parametric study as it related to fuel composition uncertainty. Per Table 5, uncertainties in fuel moisture and ash content on the order of ±10% apparently had minor impacts on the CO2, SO2, coal flow, and air preheater correction factors calculated by calibration algorithm. These observations likewise applied to ultimate analysis uncertainties of ±10% associated with sulfur, oxygen, and nitrogen weight percentages obtained from an ultimate analysis, i.e., the correction factors were insensitive to those species weight fractions. Hence such measurement uncertainties had negligible impacts on calculated EGU performance parameters such as coal flowrate, boiler efficiency, and gross and net heat rates. Ultimate analysis measurement uncertainties of ±10% for the carbon content or hydrogen content of fuel were more significant than for the other ultimate analysis measurement uncertainties. For example a ±10% uncertainty associated with coal carbon content was reflected in corresponding coal flowrate miscalculations of ±7.1% and heat rate calculation errors on the order of ±1.5% from the calibration algorithm. Similarly, hydrogen content ultimate analysis uncertainties of ±10% yielded calibration algorithm coal flowrate inaccuracies of ±2.1%, but heat rate prediction errors were limited to ±0.1%. In contrast, referring to Table 6, when correction factors taken from the calibration algorithm were used as input to the real-time algorithm, uncertainties of ±10% for each fuel component weight fraction yielded insignificant real-time prediction variations for the principal EGU performance parameters. It is concluded once the coal composition has been inferred by means of the iterative procedure, the boiler efficiency and heat rate calculations in the real-time algorithm are insensitive to fuel composition uncertainties of ±10%, provided that accurate correction factors are available as input. It should not be inferred that a ±10% measurement uncertainty for the input parameters alluded to in Tables 5–8 would represent typical values. For example, the Clean Air Act and its amendments [22] mandate much tighter restrictions on the accuracy of flue gas concentration measurements needed to monitor emissions, to verify that air quality standards have been met.
As indicated in Table 7, measurement errors on the order of ±10% for the various dynamic variables had inconsequential effects of the calibration factors determined by the calibration algorithm. The notable exceptions to that observation pertained to measurement errors associated with the steam heat transfer rate and the coal mass flowrate. For example, measurement errors of ±10% for yielded coal flow correction factors that varied over a ±10% range. Similarly, coal flowrate measurement uncertainties of ±10% yielded coal flow correction factors that exhibited approximately ±10% magnitudes. There was no discernable impact of coal mass flowrates error on heat rate predictions from the calibration algorithm, due to the fact that the losses were calculated on a per unit mass of coal basis. Per Table 8, when correction factors acquired from the calibration algorithm were used as input to the real-time algorithm, uncertainties of ±10% for each dynamic variable typically exhibited minimal impacts on the main EGU performance parameter predictions such as boiler efficiency, and gross and net heat rates. However, this was emphatically not the case for measurement uncertainties attributable to the steam and coal mass flowrates. For example, a ±10% measurement error for resulted in heat rate calculation errors of ±8.6%. Boiler efficiencies of approximately 90% implied that the majority of the heat released by coal combustion was conveyed to the steam, and was not therein attributable to losses. Similarly, a ±10% uncertainty associated with yielded heat rate calculation errors of ±1.1%. Hence it is concluded that for optimal accuracy of the output–loss method it is imperative that steam and coal mass flowrates must be measured as accurately as possible. As noted in Ref. [17], the most recently available ultimate analysis data should be provided to the real-time algorithm, to ensure its best accuracy.
Acknowledgment
This work was performed under a DOE contract awarded to ASME Standards Technology LLC (ASME ST-LLC) to develop the Annual Heat Rate Determination for Coal EGU's Project ID FE0031933 “Standardized Test Method and Calculation Protocol for Determining and Reporting Annual Heat Rate for Coal-Fueled Electricity Generating Units” Project 0166.
Conflict of Interest
There are no conflicts of interest. This article does not include research in which human participants were involved. Informed consent not applicable. This article does not include any research in which animal participants were involved.
Data Availability Statement
The authors attest that all data for this study are included in the paper.
Nomenclature
- a =
moles of hydrogen per mole of fuel carbon mole/mole
- c =
moles of oxygen per mole of fuel carbon mole/mole
- d =
moles of nitrogen per mole of fuel carbon mole/mole
- f =
moles of H2O per mole of fuel carbon mole/mole
- h =
enthalpy kW/kg (Btu/lbm)
- ℓ =
thermal losses per unit mass of coal kW/kg (Btu/lbm)
- m =
mass kg (lbm)
- =
mass flowrate kg/h (lbm/h)
- n =
moles mole
- w =
moles of H2O per mole of O2 mole/mole
- x =
mass fraction kg/kg (lbm/lbm)
- y =
mole fraction mole/mole
- A =
ash mass fraction kg/kg (lbm/lbm)
- B =
moles of sulfur per mole of fuel carbon mole/mole
- D =
denominator of any gas species mole fraction mole
- E =
moles of excess O2 per mole of fuel carbon mole/mole
- =
energy transfer rate kW (Btu/h)
- M =
moisture mass fraction kg/kg (lbm/lbm)
- =
heat transfer rate kW (Btu/h)
- T =
temperature °C (°F)
- X =
moles of unburned carbon per mole of fuel carbon kg/kg (lbm/lbm)
- Y =
radiation loss as a percentage of gross heat input
- cf =
correction factor for coal sensitivity analysis dim.
- ASH =
ultimate analysis ash mass %
- Bottom Ash =
bottom ash
- CO2CorFac =
CO2 correction factor mole/mole
- CoalFlCorFac =
coal flow correction factor kg/kg (lbm/lbm)
- FLYASH =
fraction of total ash appearing as fly ash kg/kg (lbm/lbm)
- FM =
ultimate analysis moisture mass %
- FM2 =
moles of H2O per mole of fuel carbon mole/mole
- HHV =
higher heating value kW/kg (Btu/lbm)
- HR =
heat rate Btu/kW-h
- KW =
power generated kW
- Lo =
thermal losses kW (Btu/h)
- LOI =
loss on ignition %
- MAF =
moisture ash free kg/kg (lbm/lbm)
- MW =
molecular weight kg/mole (lbm/mole)
- P1 =
carbon moles per unit weight of MAF coal mole/kg (mole/lbm)
- RLMO =
radiation loss at max output %HHV
- SO2CorFac =
SO2 correction factor mole/mole
- SS =
station service kW
- UCTASH =
fraction of unburned carbon in total ash kg/kg (lbm/lbm)
- WMCR =
heat input MW (MBtu/h)
- X2 =
moles of carbon per unit weight of MAF coal kg/mole (lbm/mole)
- XMCR =
maximum continuous rating of the boiler MW (MBtu/h)
Greek Symbols
Subscripts
- air =
air
- ash =
ash
- coal =
coal
- dry =
dry basis
- econ =
economizer exit
- flue gas =
flue gas
- formation =
formation
- in =
inlet
- moisture =
moisture
- total =
total
- out =
outlet
- unburned carbon =
unburned carbon
- AF =
as-fired
- Botash =
bottom ash stream
- Cycle =
cycle
- CRH =
cold reheat stream
- Flyash =
fly ash
- Fuel Moisture =
fuel moisture
- FW =
feedwater
- Gases =
gas
- Gross =
gross
- Hydrogen Burning =
hydrogen burning
- HRH =
hot reheat
- LA =
leakage air
- MAF =
moisture ash free
- MS =
main steam
- Net =
net
- PA =
primary air
- Pct =
percent
- Plant =
plant instrumentation
- SA =
secondary air
- Sat liq =
saturated liquid
- Stack =
air preheater exit
- Steam =
steam
- Vapor =
vapor
- Wet =
wet basis