The steam generators (SG) control the capacity factor of sodium cooled fast reactor plants and hence they are designed with high reliability. One of the strategies to enhance the reliability is to demonstrate leak before break (LBB) justification. LBB analysis is reported for 500 MWe sodium cooled fast reactor (SFR) in this paper. The material of construction is modified 9 Cr-1 Mo and the critical location is the shell nozzle junction. The initial surface crack is postulated at the critical locations at the shell nozzle junction. The critical crack length is computed by adopting the philosophy of CEGB-R6 procedure, for which Jintegral is computed by finite element method. For determining the detectable through-wall crack length, the crack opening area is also determined by finite element method. Finally, it is demonstrated that it is possible to justify leak before break argument for SFR SG with adequate margins. The required material properties are extracted from French Design Code RCC-MR-2002 and validated with tests on plates.

References

1.
Milne
,
I.
,
Ainsworth
,
R. A.
,
Dowling
,
A. R.
, and
Stewart
,
A. R.
, 1986, “
Assessment of Structures Containing Defects
,” CEGB Report R/H/R6, Revision 3, Central Electricity Generating Board, UK.A16, 1995, “Guide for Defect Assessment and Leak Before Break,” Rapport DMT 95/659, third draft.
2.
RCC-MR: Design and Construction Rules for Mechanical Components for FBR Nuclear Islands, Section I, Subsection B, Class 1 Components, AFCEN, 2002.
3.
ASME, Section III, 2001, Div 1, Subsection NH, Class 1 Components in elevated temperature service.
4.
ASME, Sec-XI, 1989, Rules for Inspection and Testing of Components of Liquid-Metal Cooled Plants.
5.
Gruter
,
L.
,
Zeibig
,
H.
,
Percie du Sert
,
B.
,
Bhandari
,
S.
, 1986, “
Leak-Before-Break Considerations for LMFBR Structures
,”
Int. J. Pressure Vessels Piping
,
24
, pp.
337
346
.
6.
Turbat
,
A.
,
Deschanels
,
H.
,
Sperandio
,
M.
, and
Faidy
,
C.
, 1995, “
The Use of LBB concept in French Fast Reactors: Application to SPX Plant
,” LBB 95, Lyon, Oct 9–11.
7.
Nakai
,
Y.
,
Mochizulei
,
T.
, and
Kawashima
,
K.
, 1982, “
Safety aspects in the design of MONJU
,” Lyon-Ecully, France, July 19–23, Vol.
1
, pp.
105
114
.
8.
RCC-MR: Appendix A16: Guide for Leak Before Break Analysis and Defect Assessment, AFCEN, 2002.
9.
Beaudoin
,
B. F.
,
Quiñonesand
,
D. F.
, and
Hardin
,
T. C.
, 1990, “
LBB Application in US Light Water Reactor Balance-of-Pipings
,”
Int. J. Pressure Vessels Piping
,
43
, pp.
67
83
.
10.
Koi
,
M.
,
Aoto
,
K.
,
Wada
,
Y.
, and
Ueno
,
F.
, 1993, “
Fracture Toughness and Criterion of Unstable Ductile Fracture of 9Cr-1Mo Steel and Weldment
,”
Post Conference Seminar on Inelastic Analysis, Fatigue, Fracture and Life Prediction, SMiRT-12
, Aug. 23–24, pp.
36
52
.
You do not currently have access to this content.